Started service between Kai Tak and Tai Wai Stations on MTR Tuen Ma Line Phase 1

Started service between Kai Tak and Tai Wai Stations on MTR Tuen Ma Line Phase 1

The service between Kai Tak(啟德) and Tai Wai(大圍) Stations on MTR Tuen Ma Line(屯馬綫) began on February 14, 2020. It was integrated with the section between Tai Wai and Wu Kai Sha(烏溪沙) Stations, which operated as Ma On Shan Line(馬鞍山綫). The whole section is now referred to as the line name “MTR Tuen Ma Line Phase 1(屯馬綫一期)”. The newly opened stations are Kai Tak and Hin Keng(顯徑) Stations. It is connected to MTR Kwun Tong Line(觀塘綫) at Diamond Hill(鑽石山) Station on the way. 横山 勝巳 / Yokoyama Katsumiスマートフォンアプリ「乗換路線図」の路線図デザイナーとして、日本全国のみならず世界各国の鉄道路線図の制作を手がける。そのかたわら、刻一刻と変わりゆく鉄道業界の出来事を整理し、わかりやすく発信する目的で鉄道・交通系ライター業をスタート。大阪府堺市出身。

Read More

Started service between Woodlands North and Woodlands South Stations on MRT Thomson-East Coast Line

Started service between Woodlands North and Woodlands South Stations on MRT Thomson-East Coast Line

The service between Woodlands North and Woodlands South Stations on MRT Thomson-East Coast Line(TE) began on January 31, 2020. Newly opened stations are Woodlands North(TE1) and Woodlands South(TE3). It is connected to the MRT North South Line(NS) at Woodlands Station(TE2) on the way. TE Line will be continued construction in the future, extending to downtown and east coast districts. 横山 勝巳 / Yokoyama Katsumiスマートフォンアプリ「乗換路線図」の路線図デザイナーとして、日本全国のみならず世界各国の鉄道路線図の制作を手がける。そのかたわら、刻一刻と変わりゆく鉄道業界の出来事を整理し、わかりやすく発信する目的で鉄道・交通系ライター業をスタート。大阪府堺市出身。

Read More