The Haga Utsunomiya LRT, a new light rail transit that is being constructed with the aim of opening in August 2023, will soon begin trial operation for the first time in some sections where construction has been completed.
Read More
Tag: Engineering work
A 23 km tunnel planned on Yamagata Shinkansen – Difficult section with heavy snowing
Yamagata Prefecture and JR East have signed a memorandum of understanding for the early realization of a plan to construct the 23km “Yonezawa Tunnel (provisional name)” between Fukushima Station and Yonezawa Station on the Yamagata Shinkansen.
Read MoreJoetsu Shinkansen will run 7 minutes faster – Maximum speed raises 240 to 275 km/h
JR East announced that it is expected to complete the ground equipment renovation work to improve the maximum speed between Omiya and Niigata on the Joetsu Shinkansen, and will shorten the required time from the spring of 2023.
Read More