Pre-operation of “TOKYO BRT” connecting Tokyo downtown and the coastal areas started

Pre-operation of "TOKYO BRT" connecting Tokyo downtown and the coastal areas started

The bus rapid transit system “TOKYO BRT” was opened on October 1, 2020 to meet the traffic demand in the Tokyo coastal areas where the population continues to grow. Keisei Bus is in charge of the operation. For the time being, it is positioned as a pre-operation (primary), and the one shuttle launched from Toranomon Hills (connecting to the station of the Tokyo Metro Hibiya Line) to Harumi BRT Terminal. The new stops are as follows. Toranomon Hills (虎ノ門ヒルズ, B11) Shimbashi (新橋, B01) Kachidoki BRT (勝どきBRT, B02) Harumi BRT Terminal (晴海BRTターミナル, B22) A total of 9 vehicles Tokyo BRT exclusive featuring pastel rainbow colors have been procured. One of them…

Read More